考前模拟试题(一)及参考答案

发布时间:2006-06-29 05:21     点击:
分页:上一页  1 [2] 3 4  下一页

  B. Alternative objectives inventory.

  C. Management by objectives.

  D. Contingency planning.

  6. Configuration management is:

  A. Used to ensure that the description of the project product is correct and complete.

  B. The creation of the work breakdown structure.

  C. The set of procedures developed to assure that project design criteria are met.

  D. A mechanism to track budget and schedule variances.

  7. A fundamental tenet of modern quality management holds that quality is most likely to be achieved by:

  A. Planning it into the project.

  B. Developing careful mechanisms to inspect for quality.

  C. Striving to do the best job possible.

  D. Conducting quality circle activities.

  8. Your most recent project status report contains the following information: BCWP = 3,000, ACWP = 3,500, and BCWS = 4,000. The schedule variance is:

  A. + 1,000.

  B. + 500.

  C. - 500.

  D. - 1,000.

  9. Learning curve theory emphasizes that in producing many goods:

  A. Cost decreases as production rates increase.

  B. Average unit cost decreases as more units are produced.

  C. Materials become cheaper when they are purchased in bulk.

  D. Laborers become more productive because of technological advances.

  10. Rearranging resources so that constant resource levels are maintained is called:

  A. Floating.

  B. Leveling.

  C. Restructuring.

  D. Crashing.

  11. The _________ is a time-phased budget that will be used to measure and monitor cost performance in the project.

  A. Work breakdown structure

  B. Project schedule
分页:上一页  1 [2] 3 4  下一页
版权申明:未经书面授权请勿转载本站信息!!作品版权归所属媒体与作者所有!!
发表评论: 匿名发表 用户名: 查看评论
您将承担一切因您的行为、言论而直接或间接导致的民事或刑事法律责任
留言板管理人员有权保留或删除其管辖留言中的任意内容
本站提醒:不要进行人身攻击。谢谢配合。
在本站搜索相关信息
2003-2005 Ksw123.com All Rights Reserved. - TOP
Copyright © 2006 Ksw123.com. All rights reserved.中国考题网 版权所有