___(68)___the initiation of the successor activity, depends upon the initiation of the predecessor activity.
(66) A.PDM B.CPM C.PERT D.AOA
(67) A.F-S B.F-F C.S-F D.S-S
(68) A.F-S B.F-F C.S-F D.S-S
● estimating schedule activity costs involves developing an ___(69)___ of the cost of the resources needed to complete each schedule activity. Cost estimating includes identifying and considering various costing alternatives.for example,in mostapplication areas,additional work during a design phase is widely held to have the potential for reducing the cost of the execution phase and product oprations. the cost estimating process considers whether the expected savings can offset the cost of the additional design work. cost estmates are generally expressed in units of ___(70)___ to facilitate comparisons both within and across projects. the ___(71)___ describes important information about prject requirement that is considered duing cost estimating.
(69) A.accuracy B.approxination C.specification D.summary
(70) A.activity B.work C.currency D.time
(71) A.project scope statement B.statement of work
C.project management plan D.project policy
● The ___(72)___ technique involves using project characteristics in a mathematical model to predict total project cost.models can be simple or complex.
(72) A.cost aggregation B.reserve analysis
C.parametric estimating D.funding limit reconciliarion
● ___(73)___ is ameasurable, verifiable work poduct such as specification.feasibility study report, detail document, or working prototype