  (68)A.special   B.dependent C.similar     D.dissimilar

  (69)A.syntax    B.semantics C.language   D.format

  (70)A.analyze   B.parse   C.delete    D.create

  ● The purpose of the requirements definition phase is to produce a clear, complete, consistent, and testable _(71)_ of the technical requirements for the software product.

During the requirements definition phase, the requirements definition team uses an iterative process to expand a broad statement of the system requirements into a complete and detailed specification of each function that the software must perform and each _(72)_ that it must meet. The starting point is usually a set of high level requirements from the _(73)_ that describe the project or problem.

  In either case, the requirements definition team formulates an overall concept for the system and then defines _(74)_ showing how the system will be operated publishes the system and operations concept document and conducts a system concept review (SCR).

  Following the SCR, the team derives _(75)_ requirements for the system from the high level requirements and the system and operations concept. using structured or object-oriented analysis. the team specifies the software functions and algorithms needed to satisfy each detailed requirement.

  (71)A.function   B.definition   C.specification  D.statement

  (72)A.criterion   B.standard    C.model      D.system

  (73)A.producer   B.customer    C.programmer    D.analyser

  (74)A.rules     B.principles   C.scenarios    D.scenes

  (75)A.detailed   B.outlined    C.total      D.complete
分页:上一页  1 2 3 4 5 6 7 8 9 [10] 
版权申明:未经书面授权请勿转载本站信息!!作品版权归所属媒体与作者所有!!
发表评论: 匿名发表 用户名: 查看评论
您将承担一切因您的行为、言论而直接或间接导致的民事或刑事法律责任
留言板管理人员有权保留或删除其管辖留言中的任意内容
本站提醒:不要进行人身攻击。谢谢配合。
在本站搜索相关信息
2003-2005 Ksw123.com All Rights Reserved. - TOP
Copyright © 2006 Ksw123.com. All rights reserved.中国考题网 版权所有